🤝 New Dealership · 1-on-1 Expert Guidance

You don't have to
figure this out
alone.

From the day you decide to apply to the day your pump opens — a dedicated PPG expert is with you at every step. 500+ successful dealerships. 15+ years of on-ground experience. One expert. Your journey.

✅ 500+ dealerships guided
📞 WhatsApp-first support
🗓️ From application to commissioning
⭐ 4.9/5 satisfaction
Expert available now
R
Rajiv Mishra — Your Expert
New Dealership Specialist · PPG
22 years · 180+ dealerships guided · IOCL, BPCL, HPCL
Sarnath's Journey Progress
Eligibility confirmed
OMC selected — IOCL
Documents prepared
4
Application submitted — awaiting site visit
5
Site inspection prep
6
LOI and agreement
7
Construction & commissioning
WhatsApp with your expert
The Reality

Getting a petrol pump dealership is harder than it looks

Most first-time applicants spend 2–4 years trying on their own — getting rejected, not knowing why, reapplying incorrectly. Our guided clients get there in 12–18 months, with a 95% LOI success rate.

😕
You don't know what you don't know
The difference between an accepted and rejected application is often something the applicant never knew was a requirement — land use classification, road setback norms, specific document attestation. Experts know these in advance.
📬
OMC communication is one-sided
When your application is rejected, the OMC rarely tells you why. When a site inspection fails, you don't get feedback. Our experts read the signals and tell you exactly what went wrong — and how to fix it for the next round.
Each failure costs a year
OMC dealership advertisements are infrequent — often once every 2–3 years for a given district. One avoidable mistake means waiting years for the next opportunity.
🏗️
Construction and commissioning is uncharted
Even after getting the LOI, most new dealers make expensive errors in construction — wrong drawings, non-approved equipment, missed licences — that delay commissioning by months.
Results with PPG Handholding Support
🎯
95%
LOI issuance rate for clients with full handholding support
📅
12 mo
Average time from first application to LOI — vs 3–4 years unassisted
🏗️
Zero
Commissioning rejections for clients who followed our construction guidance
4.9/5
Average satisfaction score from 500+ guided dealers
💡 These numbers come from clients who engaged PPG Handholding Support from the application stage — not from those who approached us mid-process.
What's Included

End-to-end support across every phase

Your PPG expert is assigned to you from the moment you engage — and stays with you until your pump makes its first sale.

Phase 1 · Pre-Application
🔍
Eligibility & OMC Assessment
Before you spend a rupee on application fees, your expert assesses your land, investment capacity, location, and personal profile — and gives you an honest probability score.
Land eligibility check — size, road frontage, title
OMC recommendation based on your profile
Category assessment — SC/ST, OBC, Ex-servicemen
Investment feasibility review
Honest probability assessment before you apply
Pre-Application
Phase 2 · Application
📝
Document Preparation & Filing
Your expert reviews every document before upload, ensures correct formats and attestations, and guides you through the OMC portal submission — reducing rejection risk to near zero.
Complete document checklist for your OMC
Individual review of every document before upload
OMC portal walkthrough — step by step
Deadline tracking and submission confirmation
Application fee and payment guidance
Application Phase
Phase 3 · Site Inspection
🏗️
Site Inspection Preparation
The site inspection is the most critical stage. Your expert prepares you completely — what the inspection team measures, what to clear, what to have ready, and how to present yourself.
Site inspection checklist — what the OMC team measures
Document originals to keep ready on the day
Site clearing and access preparation guidance
Expert available on call during inspection day
Post-inspection feedback analysis
Site Inspection
Phase 4 · Selection
📋
LOI & Dealership Agreement
When the LOI arrives, most new dealers don't read it carefully — and miss important terms. Your expert reviews the LOI with you, explains every clause, and guides you through the agreement signing.
LOI clause-by-clause explanation
Security deposit payment and acknowledgement
Dealership agreement review before signing
Construction timeline planning from LOI date
First 90-day action plan post-LOI
LOI Stage
Phase 5 · Construction
🔧
Licences, Build & Installation
The construction phase has the most expensive mistakes. Your expert tracks licence applications, reviews construction drawings, and helps you avoid the common errors that cause commissioning rejection.
PESO licence application guidance
Construction drawing review before OMC submission
OMC-approved vendor recommendations
Fire NOC and other licence timeline tracking
Pre-commissioning inspection preparation
Construction Phase
Phase 6 · Launch
🎉
Commissioning & First 90 Days
Getting commissioned is one milestone — running a profitable pump is another. Your expert stays engaged for 90 days after opening to guide daily operations, staff management, and ComplianceGuard setup.
Commissioning inspection walkthrough
Staff hiring and training guidance
ComplianceGuard setup for all 20 licences
First month P&L review and optimisation
Introduction to PPG SaaS tools for ongoing management
Post-Launch
How It Works

Simple. Personal. WhatsApp-first.

There are no offices to visit. No forms to fill every time you need help. Your expert is one WhatsApp message away — and they know your full story.

1
Register and share your profile
Register on PPG and fill a 10-minute profile questionnaire — land details, location, investment capacity, and goals. This is what your expert studies before your first call.
⚡ Takes 10 minutes
2
Expert assigned — first call within 24 hours
A dedicated expert studies your profile and calls within 24 hours. This is not a sales call — it is a genuine assessment of your situation and an honest plan for next steps.
📞 Within 24 hours
3
WhatsApp as your primary channel
All ongoing communication happens on WhatsApp — documents sent, questions answered, checklists shared. You always have a response within 4 hours during working hours.
💬 4-hour response guarantee
4
Monthly video call milestone reviews
Once a month, you and your expert do a 45-minute video call to review progress, update the plan, and address anything that is coming up in the next 30 days.
📹 Monthly milestones
5
Your expert stays until your pump opens
Unlike consultants who disappear after the LOI, your PPG expert stays engaged through construction, commissioning, and the first 90 days of operation.
🎉 End-to-end commitment
What your expert does — proactively
📡
Monitors OMC advertisements for your district
Your expert tracks IOCL, BPCL, and HPCL advertisements and alerts you the moment an opportunity appears in your area — before you would find it yourself.
🗓️
Tracks all deadlines — proactively reminds you
Application deadline, document submission, site inspection date, LOI expiry, PESO licence renewal — your expert sends you reminders before you even think of them.
🔍
Reviews every document before you submit
Every document goes through your expert's eyes before it goes to the OMC. Errors, missing attestations, wrong formats — caught before they cause rejection.
🏗️
Reviews construction drawings for OMC compliance
Before you submit drawings to the OMC for approval, your expert checks them against the OMC's standard specifications — avoiding costly revision requests.
📞
Available on call for urgent situations
PESO inspector arrived unannounced? OMC sent a surprise notice? Your expert picks up the phone and walks you through it in real time — not in a week.
🎯 Sample Session

What a typical expert session covers

This is an example of a Session 1 — the initial assessment call that every new client gets within 24 hours of registering.

Session 1 — Initial Assessment & Planning
Expert: Rajiv Mishra · Duration: 90 minutes · Via Video Call
Sample
1
Profile Review & Eligibility Assessment
20 min
What the expert covers
Review land documents — title clarity, size, use classification, road frontage
Personal eligibility — age, education, financial capacity, category
Honest assessment — "Is this location likely to be selected?" — based on 15+ years of site reading
Identify any issues to fix before applying (land conversion, mutations, etc.)
2
OMC Recommendation & Strategy
20 min
What the expert covers
Which OMC to target — IOCL, BPCL, or HPCL — and why for your specific profile
Current advertisement status for your district — is there an active opportunity?
Alternative districts to consider if your district has low advertisement frequency
Expected timeline — realistic estimate from application to LOI for your situation
3
Document Gap Analysis
25 min
What the expert covers
Complete document checklist for your selected OMC and category
Which documents you already have and which ones to obtain
How to get documents that are missing (khatauni, mutation, land use conversion)
Estimated time to get all documents ready — before the next advertisement
4
Investment Estimate & Funding Plan
15 min
What the expert covers
Total investment estimate for your specific OMC, location type, and configuration
Phased investment timeline — what you need when
Bank loan feasibility — what banks will lend against a petrol pump project
Session Output — Your Personalised Action Plan
Week 1
Get khatauni updated and mutation done at tehsil — estimated 15 days
Week 3
Land use conversion application submitted to collector's office
Month 2
All personal documents collected and self-attested per IOCL requirements
🔒
Your personalised action plan — after login
Based on your land, location, and OMC — specific steps, timelines, and what to do first.

⚠️ Independent Platform: PetrolPumpGuru.com is not affiliated with, endorsed by, or representing IOCL, BPCL, HPCL, or any OMC. All trademarks belong to their respective owners. Information on this website is for educational and informational purposes only. Users should verify all applicable rules, notifications, and compliance requirements from official OMC/government sources.